Skip to main content

CVPCSD Water Infrastucture Updates

The image shows water treatment and storage tanks at Christian Valley Park, with tank #2 entering service on June 11, 2021.
The One Year Long Water Treatment Plant Retrofit Project nearly finished June 2020-2021

In June 2020 construction began on a full retrofit of the reservior replacement with two 750,000 gallon steel tanks. 

Arial view of the existing CVPCSD Reservoir
Arial view of CVPCSD Tank Project area with overlay of drawings for Tank placements
Topographical Map of the Tank Project Area
The image shows the interior of Tank 2, where workers are preparing for coating; the green is zinc primer.
Tank 2: Intermediate Coat_note pink tint to distinguish from top coat (white)
Tank 2: Interior Sand blasting_ black sand on the floor
Tank 2: Interior White Coating
A worker on a lift is applying a green top coat over a white intermediate coat on a large tank.
The image shows water treatment and storage tanks at Christian Valley Park, with tank #2 entering service on June 11, 2021.

For more detailed information please see the related Water Tank Project information provide herein.

The image contains a water report detailing average flow, maintenance, and water line repairs in Christian Valley Park for May 2021.
Water report outlines maintenance on pump repairs, issues with a hydro-pneumatic tank, and a motor replacement at the plant.
The image is a water report for Christian Valley Park, detailing upcoming work, filter inspections, and regulatory reporting as of May 2021.
The image is a water report detailing maintenance issues, contractor changes, and costs related to tank construction for Christian Valley Park.
CVPCSD Water Storage Tank Project PR Draft ISMND for website.pdf

 

Join our mailing list